Stable Power Delivery for Extreme Arc Conditions and Highly Repeatable Films
Advanced Energy’s front-line DC generator provides performance and reliability required in dual-magnetron sputtering applications.
- Arcs are actively managed, versus a generic pre-set arc response
- Less than 0.4 mJ per 1 kW of output energy
- Stable, repeatable process through arcing conditions
- Primary/secondary for high power applications
- Higher power levels with reduced arc damage
Datasheet